Major Design Works PDF Print E-mail

Kozienice Power Plant

  • Multi-variant conceptual and detailed designs for the modernization of the Main Building regarding, in particular, fire fighting requirements (2009).
  • Multi-discipline technical documentation (concepts, basic and detailed engineering) necessary for the performance of gradual, comprehensive modernization of the 200 MW power units (1995÷2004).
  • Multi-discipline technical documentation (concepts, basic and detailed engBineering) necessary for the performance of comprehensive modernization of the 2 x 500 MW power units (1997÷2001).
  • Design concept and Building Permit Documentation related to the project “Construction of the Water Demineralisation Station DEMI II for raw water pipelines 2 DN 350 from the pumping station to the new building, and feed pipelines DN 300 evacuating industrial waste from the designed Station to slurry pumping stations” (2002÷2003).
  • Multi-discipline technical documentation necessary to perform comprehensive modernization of the coal handling system for the 8 x 200 MW power units (2000÷2002).
  • Multi-discipline technical documentation (concepts, Building Permit Documentation and detailed engineering) for the replacement of electrostatic precipitators at the 200 MW power units no. 3, 7, 8 (1995÷1996).

PGE Bełchatów Power Plant
  • Multi-discipline technical documentation (Building Permit Documentation and detailed engineering for selected buildings and engineering structures) for the construction of a 858 MW supercritical power unit (2006÷2009).
  • Multi-discipline technical documentation (basic engineering, detailed engineering and as-built engineering) for the construction of a Flue Gas Desulphurisation System for a 858 MW supercritical power unit (2006÷2009).
  • Multi-discipline technical documentation (Building Permit Documentation and detailed engineering) for the redevelopment of the coal dumping building P I/6 and coal sorting building P III/10 (2009).
  • Multi-discipline technical documentation (basic engineering, detailed engineering and as-built documentation) for the modernization of live steam pipelines, reheated steam pipelines, flue gas reheating steam pipelines and feed water pipelines for boiler BB-1150 of a 360 MW power unit (2006÷2008).
  • Multi-discipline technical documentation (detailed engineering, documentation for licenses, workshop designs and as-built documentation) for the modernization of HP and MP pipelines of 18K370 turbine at a 360 MW power unit no. 3 (2007÷2008).
  • Multi-discipline technical documentation (Building Permit Documentation, detailed engineering and as-built documentation) for the project “Construction of the water intake on Krasówka river” for the needs of the power plant water management (2002÷2005).
  • Multi-discipline technical documentation (Building Permit Documentation, detailed engineering and as-built documentation) for the modernization of the Water Treatment Station for boiler cycle at the power plant (2002÷2003).
  • Multi-discipline technical documentation (concepts, basic engineering, Building Permit Documentation and detailed engineering) required to perform the modernization of the existing and construction of the new system of furnace ash hydraulic evacuation to the new landfill (1998÷2003).

Pątnów Adamów Konin Power Plants Group
  • Multi-variant conceptual and detailed designs for the modernization of transformer cooling and insulation oil drip pans at the Adamów Power Plant (2009).
  • Multi-discipline technical documentation (concepts, Building Permit Documentation, detailed engineering and as-built documentation) for the construction of a 464 MW supercritical power unit at the Pątnów Power Plant (2001÷2008).
  • Modernization of the central cooling water pumping stations no. 1 and 2 for the 200 MW power units at the Pątnów Power Plant (2006÷2007).

Połaniec Power Plant – Electrabel Polska Group
  • Detailed engineering (electrical part) for the replacement of 6 switchgears 6 kV (2009).
  • Multi-discipline technical documentation (concept, Building Permit Documentation and detailed engineering) for the construction of central control room and the guaranteed power supply system (2002÷2003).

Vattenfall Heat Poland S.A.
  • Building Permit Documentation for the construction of a 480 MW supercritical power unit at the Siekierki CHP Plant (2009).
  • Multi-discipline technical documentation (Building Permit Documentation and detailed engineering), including the preparation and acquiring of official permits for the construction of a heat accumulator system at the Siekierki CHP Plant (2006÷2009).
  • Multi-discipline technical documentation (basic engineering, detailed engineering and as-built documentation) for the modernization of district heating water pumps system at the Siekierki CHP Plant (2005).
  • Multi-discipline technical documentation (Building Permit Documentation and detailed engineering) for the construction of fluidized bed boilers “A” & “B” at the Żerań CHP Plant (1994÷2001).
  • Complete design of retention tank ZRP-3 (V = 2800 m3) for a fly ash from the fluidized bed boilers “A” & “B” at the Żerań CHP Plant (2000÷2001).

PGE Lublin – Wrotków CHP Plant

Construction of a gas and steam combined cycle unit with an output of 235 MWel and 150 MWth at the CHP plant (1996÷2007).
The work scope included:
  • pre-feasibility study,
  • feasibility study in the technical part along with the environmental impact assessment,
  • management, on behalf of the Investor, of a tender for the selection of General Contractor of a gas and steam combined cycle unit,
  • Building Permit Documentation, detailed engineering and as-built documentation,
  • consultancy regarding the operation and economical and finance monitoring of a gas and steam combined cycle unit.

PGE Rzeszów CHP Plant

Construction of a gas and steam combined cycle unit with an output of 101 MWel and 76 MWth at the CHP plant (1998÷2003).
The work scope included:
  • pre-feasibility study,
  • feasibility study,
  • management, on behalf of the Investor, of a tender for the selection of General Contractor of a gas and steam combined cycle unit, along with the development of Terms of Reference, bids completeness evaluation and bidder’s selection, as well as preparation of the contract with the General Contractor,
  • Building Permit Documentation, detailed engineering and as-built documentation (thermal-process part in the scope of steam and water systems as well as gas and oil pipelines).

Wybrzeże CHP Plants
  • Multi-discipline technical documentation (detailed engineering and as-built documentation) for the redevelopment and extension of water and waste management at the Gdańsk CHP Plant (2004÷2008).
  • Development of the concept and detailed engineering of the safe unit shutdown system at the Gdańsk CHP Plant in case of emergency disconnection from the national power grid (2003).

Kraków CHP Plant
  • Multi-discipline technical documentation (Building Permit Documentation and detailed engineering) for the construction of a heat accumulator system (2009)

Białystok CHP Plant
  • Multi-discipline technical documentation (basic engineering, Building Permit Documentation, detailed engineering and as-built documentation) for the construction of a biomass-fuelled system for renewable energy generation (2006÷2008).

Energa Ostrołęka Power Plants
  • Multi-discipline technical documentation (Building Permit Documentation, detailed engineering and as-built documentation) for the construction of a Flue Gas Desulphurisation System at the Ostołęka “B” Power Plant (2005÷2007).

Ignalina Nuclear Power Plant (Lithuania)
  • Multi-discipline technical documentation (Building Permit Documentation, detailed engineering and as-built documentation) in the scope of works concerning the Visaginas heating boiler station (2003÷2005).

Gorzów S.A. CHPP
  • Comprehensive technical documentation (basic engineering, detailed engineering and as-built documentation) for the electric systems of a gas and steam combined cycle unit at the Gorzów GHP Plant (1997÷1998).

Frantschach Świecie paper mill
  • Building Permit Documentation for the construction of a circulating fluidized bed boiler (Q = 234 t/h), biomass-fuelled as part of the extension of the existing Polish Energy Partners S.A. CHP Plant with an output of 550 MWth (2002).
 
Strona główna Completed projects Major Design Works

Snapshots

There are no translations available.

16 września 2008 roku odbyło się uroczyste przekazanie do eksploatacji Instalacji Biomasy w Elektrociepłowni Białystok S.A.