ENERGOPROJEKT - WARSZAWA S.A. has extensive experience and achievements in the development of designs, at various process stages, relating to the use of natural gas in the gas and steam combined cycle units and various sized boilers.
WE PROVIDE THE FOLLOWING SERVICES:1. Consulting services relating to the determination of optimal parameters of gas and steam combined cycle units.2. Consulting services relating to the form and mode of General Contractor tenders. 3. Consulting services relating to the selection of Strategic Investor (Business Plan). 4. Organisation of General Contractor tenders:
LIST OF MAJOR DESIGN WORKS RELATED TO THE CONSTRUCTION OF GAS AND STEAM COMBINED CYCLE UNITSGORZÓW COMBINED HEAT AND POWER PLANT Construction of a new GT8C gas turbine unit with electric output of 55 MW and a heat recovery boiler fired with local nitrogenised gas. Complete detailed engineering and as-built documentation was developed for the electrical part in reference to the basic egineering (upon the supplier's request - ABB Zamech Ltd in 1998).
CONSTRUCTION OF A GAS-FIRED WATER BOILER PLANT WITH NET OUTPUT OF 160 MWth IN VISAGINAS (LITHUANIA) Development of the technical part of the offer and joint participation in tender procedure with Elektrim - Megadex S.A. Multi-discipline technical documentation in areas of thermal process, civil engineering and architecture, electrical systems, utility systems, elevators and overhauls, control and instrumentation, (upon request - SNC LAVALIN) including:
LUBLIN - WROTKÓW COMBINED HEAT AND POWER PLANT Construction of a gas and steam combined cycle unit with an output of 235 MWe at the Lublin-Wrotków CHPP.
STALOWA WOLA POWER PLANT
RZESZÓW COMBINED HEAT AND POWER PLANT Preparatory works and organisation of tender procedure for the construction of a gas and steam combined cycle unit with an output of 101 MWe and 76 MWth at the Rzeszów CHPP.
MUNICIPAL HEAT DISTRIBUTION COMPANY IN TARNÓW CITY Construction of a gas turbine with net electric output of 3.73 MW operating with a heat recovery boiler with total heat output of 10 MW at the Piaskówka thermal plant.
MUNICIPAL HEAT DISTRIBUTION COMPANY IN WŁOCŁAWEK CITY Concept for the development of an electricity and heat co-generation source based on gas engines (2000). ZIELONA GÓRA COMBINED HEAT AND POWER PLANT Feasibility study for the expansion of the Zielona Góra CHPP. The following works were performed (1998):
ELBLĄG COMBINED HEAT AND POWER PLANT Concept for the modernisation and reconstruction of the power management system in the combined heat and power plant - construction of a gas and steam combined cycle unit with an output of 150 MWe. Application for a decision on land development and site planing for the gas and steam combined cycle unit and Report of Environmental Impact (1996 - 1997). POLISH POWER GRID CO. Opportunity study for the construction of a pumped-storage gas plant in the area of Mogilno City (1997) TORUŃSKA ENERGETYKA CERGIA S.A. Concept for the maintenance and development of the combined heat and power plant, including the construction of a gas and steam combined cycle unit with electric output of 150 MW. Preparatory works and organisation of a tender for the construction of a gas and steam combined cycle unit at the Toruń CHPP (1996). |
There are no translations available. W lipcu 2008 roku Energa Zakład Elektrowni Wodnych Sp. z o.o. ogłosił przetarg nieograniczony na:
|