Energoprojekt Warszawa S.A.

Polish (Poland)English (United Kingdom)
Gas and Steam Combined Cycle Units PDF Print E-mail

ENERGOPROJEKT - WARSZAWA S.A. has extensive experience and achievements in the development of designs, at various process stages, relating to the use of  natural gas in the gas and steam combined cycle units and various sized boilers.

WE PROVIDE THE FOLLOWING SERVICES:

1. Consulting services relating to the determination of optimal parameters of gas and steam combined cycle units.
2. Consulting services relating to the form and mode of General Contractor tenders.
3. Consulting services relating to the selection of Strategic Investor (Business Plan).
4. Organisation of General Contractor tenders:
  • development of Terms of Reference for the technical and commercial parts of the tender procedure
  • offer evaluation,
  • development of draft contract.
5. Formal and legal services relating to site development, involving the development of:
  • materials for the Application for a decision on land development and site planning,
  • Building Permit Documentation required for the acquisition of a construction permit.
6. Technical services relating to site development, involving the development of:
  • Concept
  • Basic engineering,
  • Detailed engineering and as-build documentation.

LIST OF MAJOR DESIGN WORKS RELATED TO THE CONSTRUCTION OF GAS AND STEAM COMBINED CYCLE UNITS


GORZÓW COMBINED HEAT AND POWER PLANT

Construction of a new GT8C gas turbine unit with electric output of 55 MW and a heat recovery boiler fired with local nitrogenised gas. Complete detailed engineering and as-built documentation was developed for the electrical part in reference to the basic egineering (upon the supplier's request - ABB Zamech Ltd in 1998).
  • Multi-variant analyses for the construction of a new power unit based on gas turbine generator set (as part of the Feasibility Study for the construction of a power unit at the Gorzów CHP plant - 2006)


CONSTRUCTION OF A GAS-FIRED WATER BOILER PLANT WITH NET OUTPUT OF 160 MWth IN VISAGINAS (LITHUANIA)

Development of the technical part of the offer and joint participation in tender procedure with Elektrim - Megadex S.A. Multi-discipline technical documentation in areas of thermal process, civil engineering and architecture, electrical systems, utility systems, elevators and overhauls, control and instrumentation, (upon request - SNC LAVALIN) including:
  • Building Permit Documentation (2004)
  • Basic engineering and detailed engineering (2004)
  • As-built documentation (2005)

LUBLIN - WROTKÓW COMBINED HEAT AND POWER PLANT


Construction of a gas and steam combined cycle unit with an output of 235 MWe at the Lublin-Wrotków CHPP.
  • Pre-feasibility study - 1996
  • Feasibility study - 1996
  • Organisation of a tender procedure for a turn-key project (1997, 1998) with the subcontractor responsible for the commercial, formal and legal aspects of the tender procedure.
  • Financial projection for the long-term agreement for electricity supply from the gas and steam power combined cycle unit to the national grid system (1997)
  • Building Permit Documentation required for the acquisition of a construction permit (1998)
  • Detailed Engineering - installation for gas and oil supply to turbine, all steam and water systems, cooling water system for the gas and steam combined cycle unit (2001)
  • As-built documentation for the systems indicated in point 6 (2002)
  • Monitoring the plant's economic and financial situation. Economic and financial projections for the operation of the gas and steam combined cycle unit (2003 - 2005).

STALOWA WOLA POWER PLANT

  • Preliminary study and analysis for the construction of a peak load gas unit (1997)
  • Preliminary study and analysis for the construction of high load gas and steam combined cycle units (1997)
  • Financial projection for the long-term agreement for electricity supply from the gas and steam combined cycle unit to the national grid system (1997)

RZESZÓW COMBINED HEAT AND POWER PLANT


Preparatory works and organisation of tender procedure for the construction of a gas and steam combined cycle unit with an output of 101 MWe and 76 MWth at the Rzeszów CHPP.
  • Building Permit Documentation required for the acquisition of the construction permit (2000)
  • Detailed Engineering for steam and water systems, oil and gas supply pipelines (2002)
  • As-built documentation (process and civil engineering) for all steam and water, compressed air, gas and oil pipelines (2003)
  • Monitoring the plant's economic and financial situation. Economic and financial projections for the gas and steam combined cycle unit (2002 - 2003).

MUNICIPAL HEAT DISTRIBUTION COMPANY IN TARNÓW CITY

Construction of a gas turbine with net electric output of 3.73 MW operating with a heat recovery boiler with total heat output of 10 MW at the Piaskówka thermal plant.
  • Building Permit Documentation required for the acquisition of a construction permit (2002)
  • Basic engineering and detailed engineering (2002)
  • As-built documentation (2003)

MUNICIPAL HEAT DISTRIBUTION COMPANY IN WŁOCŁAWEK CITY

Concept for the development of an electricity and heat co-generation source based on gas engines (2000).


ZIELONA GÓRA COMBINED HEAT AND POWER PLANT


Feasibility study for the expansion of the Zielona Góra CHPP. The following works were performed (1998):
  • preliminary specification of the costs of developing a gas and steam combined cycle unit in the Zielona Góra CHPP, including an economic and financial analysis,
  • determination of parameters for key devices, basic technical solutions for a gas and steam combined cycle unit with technical and operating data and characteristics for collaboration with the existing combined heat and power plant.
  • financial projection for the long-term agreement with the Polish Power Grid Co. for electricity supply from the gas and steam combined cycle unit.
Materials for the Application for a decision on land development and site planning (2001).


ELBLĄG COMBINED HEAT AND POWER PLANT


Concept for the modernisation and reconstruction of the power management system in the combined heat and power plant - construction of a gas and steam combined cycle unit with an output of 150 MWe. Application for a decision on land development and site planing for the gas and steam combined cycle unit and Report of Environmental Impact (1996 - 1997).


POLISH POWER GRID CO.

Opportunity study for the construction of a pumped-storage gas plant in the area of Mogilno City (1997)


TORUŃSKA ENERGETYKA CERGIA S.A.


Concept for the maintenance and development of the combined heat and power plant, including the construction of a gas and steam combined cycle unit with electric output of 150 MW. Preparatory works and organisation of a tender  for the construction of a gas and steam combined cycle unit at the Toruń CHPP (1996).
 
Strona główna Completed projects Gas and Steam combined cycle units

Snapshots

There are no translations available.

W lipcu 2008 roku Energa Zakład Elektrowni Wodnych Sp. z o.o. ogłosił przetarg nieograniczony na:
„Pełnienie czynności zastępstwa inwestycyjnego przy realizacji inwestycji pn.: ”Modernizacja Elektrowni Szczytowo – Pompowej Żydowo” oraz opracowanie kompleksowej, wielobranżowej dokumentacji technicznej modernizacji Elektrowni Szczytowo – Pompowej Żydowo wraz z uzyskaniem ostatecznej decyzji pozwolenia na budowę oraz z nadzorem autorskim”.