Hydro Power Plants PDF Print E-mail

Power plant
OutputGen. HeadTurbinesYearRemarks
MW GWh/
a
m NumTypeManufact.
DYCHÓW 79.5 96 30 2
2
K
P
LMZ/V
EW/V
1950
Hydro power plant with a pumping unit. Modernization 1997 ÷ 1999. Final modernization (by Energoprojekt 2000 ÷ 2005) - General Contractor
1
2
K
P
LMZ/V SFUP/V 1965
CZCHÓW 8 32 9 2 K V+Ch 1954 Modernization 2004 ÷ 2005
PORĄBKA 12.5 25 22 2
1
K
F
V 1954 Modernization 1995 ÷ 1996 by Energoprojekt - General Contractor
PRZEWÓZ 1.8 13 4 2 K V 1956 Modernization 1987 ÷ 1988
OLSZNA 1.8 4.5 6.5 2 K CKD 1957
WAŁY ŚLĄSKIE 9.8 45 5.5 4 K CKD 1958 Modernization 1994 ÷ 1995
KORONOWO 26 42 25 2 K CKD 1959 Hydro power plant with earth dam
TRYSZCZYN 3.3 8 4 2 K G-M 1960
MYCZKOWCE 8.4 30 22.8 2 K G-M/V 1961 Hydro power plant with earth dam. Modernization 1998 ÷ 2000 by Energoprojekt - General Contractor
DĄBIE 2.94 13 3.7 2 K G-M 1962
SOLINA 136
200.2
112
200
60 2
2
F PT-F CKD/V CKD/S 1968 Hydro power plant with a pumping unit and concrete dam. Modernization 2000 ÷ 2003 (capacity increased up to 200.2 MW).
WŁOCŁAWEK 160 640 10 6 K ChGZ 1970 Modernization
ŻYDOWO 150 193 81 2
1
PT-F F CKD 1970 Pumped-storage hydro power plant. Modernization 2000 ÷ 2012 by Energoprojekt - General Contractor
GUBIN 1.16 5.3 4.2 2 K SMW 1973 Modernization of two hydro turbine sets.
PORĄBKA-ŻAR 500 640 439 4 PT-F B+CDK 1979 Pumped-storage hydro power plant. Reconstruction of the upper reservoir in 1995 by Energoprojekt - General Contractor
ŻARNOWIEC 680 1165 119.3 4 PT-F CKD 1982 Pumped-storage hydro power plant. Reconstuction of the upper reservoir in 2006. Modernization of the hydro turbine sets by Energoprojekt - General Contractor
MŁOTY 750 1200 271.6 3 PT-F (CKD) planned Pumped-storage hydro power plant
CZORSZTYN - NIEDZICA 93 128 46.1 2 PT-DR CKD 1997 Hydro power plant with a pumping unit
SROMOWCE WYŻNE 2 7.5 9.5 4 FL FL 1994 Design and development by Energoprojekt - General Contractor
JEZIORSKO 4.9 21 6.5 2 K ZRE 1994
SOBOLICE 0.66 3.9 3.2 2 K D 1993 Modernization
KLICZKÓW 0.64 2.65 5.9 1 FL FL 1994
DOBCZYCE 2.24 6.8 28.6 2 K CKD 1993
KLIMKÓWKA 13 5.4 30.5 1 K CKD 1994
MAŁOMICE 0.80 3.1 2.7 2 K D 1992 Modernization
MAZIARNIA 0,05 0.3 6.9 1 B-M ZRE 1985
BUKÓWKA 0.84 5.4 5.6 2 FL FL 1992
SWINNA PORĘBA 3.8 18 37.6 2 K design Hydro power plant and water reservoir - under construction
NYSA 0.27 1.8 3.5 1 FL FL 1993 Replacement of 1th hydro turbine unit set by Energoprojekt - General Contractor
TOPOLA 1.56 6.85 6.5 3 FL FL 2002 Energoprojekt - General Contractor
ZASIEKI 0.82 5 3.7 2 K D 1996 Modernization of hydro power plant and weir in 2004
SIEMIANÓWKA 0.16 1.1 7 2 FL FL 1996 Design, site supervision and start-up
GORZUPIA 1.68 10.1 4.6 4 FL FL 1998
ŻAGAŃ I 0.9 4.8 2.8 3 RK M 1998 Modernization
KĘPKA 0.52 2.3 4.4 2 K ZRE 1998 Reconstruction
SZPROTAWA 0.63 3.7 2.9 2 RK M 1998
MALCZYCE 11.4 45.7 5.8 2 RKG - planned
Building Permit Documentation - 2006. Detailed engineering - 2007. Modernization 2005 - 2011 by Energoprojekt - General Contractor
ROŻNÓW 50 102 29.7 4 K EW

2000

Modernization of 4 hydro turbine sets by Energoprojekt - General Contractor
PRZYSIEKA 1.3 6.57 5.4 2 RK S 2001
RAKOWICE 1.8 9.1 8.6 2 RK M 2005
TRZEBIATÓW 0.25 1.9 2.6 1 RK M 2001
JANUSZKOWICE 1.4 7.1 2.6 2 RK VA - TECH 2003
KRĘPNA 1.26 7.0 2.5 2 RK M 2004
KRAPKOWICE 1.4 7.28 2.6 2 RK M 2005
ZIELISKO 1.36 5.8 3.6 3 RK M 2002 Replacement of 2 hydro turbine sets and modernization of 1th hydro turbine set.
WIELOWIEŚ KLASZTORNA 0,7 3,2 10,5 2 - - design Hydro power plant with a lifting weir
SMOLICE 1,3 6,9 3,6 2 RK M 2006
BOBROWICE III 1,1 5,6 9,6 2 - - design Concept development
DOBRZEŃ 1,5 9,5 2,1 2 RK M 2008
CZANIEC 0,4 1,3 9,3 1 RK - design Hydro power plant on a dam
BRZEG 0,4 2,0 2,5 1 K GEG design Moderniztation - 1th stage
JANOWICE 1,5 10,65 3,7 4 RK GEG design Moderniztation
BYSTRZYCA KŁODZKA 0,4 1,3 6,5 2 - - design Moderniztation
RZESZÓW 0,6 3,0 6,0 1 K M design Hydro power plant with a fish pass by the existing stage - under construction.
POŁOCKA (Białoruś) 20,0 90,0 7,7 5 RKG - design Modernization
RADUSZEC STARY 3,0 15,0 4,8 2 K V design
CHAŃCZA 0,16 1,1 12,0 1 RK - design

Oznaczenia typu turbin
K Kaplan turbine
F Francis Turbine
B-M Bank-Michell turbine
PT-F Francisa reversible pump turbine
PT-DR Deriaza reversible pump turbine
FL FLYGTA turbine unit
P pumps
RK Full Kaplan turbine
RKG Full Kaplan turbine with inner generator
Producent turbin
CKD
CKD Blansko Czechoslovakia
B Boving England
V Voith Austria
CH
Charmille Switzerland
EW
Escher Wyss Switzerland
G-M
Ganz - Mavag Hungary
LMZ
LMZ Petersburg Russia
ChGZ
ChGZ Charkov Ukraine
ZRE
Zakłady Remontowe Energetyki Gdańsk Poland
D Dozamet Nowa Sól Poland
SMW Stocznia Marynarki Wojennej, Gdynia Poland
SFUP Świdnicka Fabryka Urządzeń Przemysłowych Poland
FL ITT Flygt Sweden
M MAVEL Czech Republic
S Sulzer Hydro, Ravensburg Germany
GEG Gajek Engineering

 
Strona główna Completed projects Hydro power plants

Snapshots

There are no translations available.

W lipcu 2008 roku Energa Zakład Elektrowni Wodnych Sp. z o.o. ogłosił przetarg nieograniczony na:
„Pełnienie czynności zastępstwa inwestycyjnego przy realizacji inwestycji pn.: ”Modernizacja Elektrowni Szczytowo – Pompowej Żydowo” oraz opracowanie kompleksowej, wielobranżowej dokumentacji technicznej modernizacji Elektrowni Szczytowo – Pompowej Żydowo wraz z uzyskaniem ostatecznej decyzji pozwolenia na budowę oraz z nadzorem autorskim”.